Presentation, discussion and consideration of approval of entering into an agreement with CORE Construction Corporation for the remodel of the Police Department 911 dispatch center to include but not limited to the demolition; new enclosure; interior finishes; window coverings; signage; fire sprinkler systems; plumbing systems; mechanical controls; mechanical systems; electrical systems; fire alarm; structural cabling and security/access control. Two alternative options to the remodel is to replace the existing concrete patio and replace it with new sloped concrete with a drain and/or restroom renovation per ADA requirements. Staff recommends entering into an agreement with CORE Construction Corporation for the remodel of the Police Department 911-dispatch center in the amount not to exceed $428,794.
|